How To Fix C3059 - Costing type & has more than one standard cost est for valuation view &


C3059 - Overview

  • Message type: E = Error

  • Message class: C3 - Messages for Check Reports and Function Modules in Costing

  • Message number: 059

  • Message text: Costing type & has more than one standard cost est for valuation view &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C3059 - Costing type & has more than one standard cost est for valuation view & ?
    The SAP error message C3059 indicates that there is an issue with the costing type in the system. Specifically, it means that there is more than one standard cost estimate for a particular valuation view, which is not allowed. This can occur in the context of product costing and material valuation in SAP.
    
    Cause: Multiple Cost Estimates: The primary cause of this error is that there are multiple standard cost estimates for the same material and valuation view. This can happen if cost estimates were created incorrectly or if there were changes made to the costing type that were not properly managed. Incorrect Configuration: The configuration settings for the costing type or valuation view may not be set up correctly, leading to conflicts in the system. Data Inconsistencies: There may be inconsistencies in the master data or transaction data related to the material or costing type.
    Solution: Check Cost Estimates: Go to the cost estimate management

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author