How To Fix C2389 - Item &1: Shortage of &2: &3 (Operation &4)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C2 - Other messages production orders

  • Message number: 389

  • Message text: Item &1: Shortage of &2: &3 (Operation &4)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C2389 - Item &1: Shortage of &2: &3 (Operation &4) ?

    The SAP error message C2389 typically indicates a shortage of materials or components required for a specific operation in a production order or process. The message format provides specific details about the item, the shortage quantity, and the operation number involved.

    Cause:

    The error message C2389 is triggered when:

    1. Material Shortage: There is not enough stock of the specified item (&1) to fulfill the requirements for the operation (&4).
    2. Incorrect Planning: The material requirements planning (MRP) may not have been executed correctly, leading to insufficient stock levels.
    3. Inventory Issues: The material may be reserved for other orders, or there may be discrepancies in inventory records.
    4. Lead Time Issues: The lead time for procurement or production may not have been accounted for, leading to shortages at the time of production.

    Solution:

    To resolve the C2389 error, you can take the following steps:

    1. Check Stock Levels: Verify the current stock levels of the item (&1) in the relevant storage location. Use transaction codes like MMBE to check stock availability.

    2. Review MRP Settings: Ensure that the MRP settings for the material are correctly configured. This includes checking the reorder point, safety stock, and lead times.

    3. Procurement: If there is a shortage, consider procuring additional stock. You can create a purchase order or production order to replenish the inventory.

    4. Adjust Production Schedule: If the shortage cannot be resolved immediately, you may need to adjust the production schedule or operations that depend on the item.

    5. Check Reservations: Look for any existing reservations or allocations that may be consuming the available stock. You can use transaction code MB22 to check and manage reservations.

    6. Run MRP: If necessary, run the MRP process again to update the requirements and availability of materials.

    7. Communicate with Stakeholders: Inform relevant stakeholders (e.g., production planners, procurement) about the shortage and the steps being taken to resolve it.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04 (Stock/Requirements List), MMBE (Stock Overview), and MD01 (MRP Run).
    • Material Master Data: Ensure that the material master data is accurate and up-to-date, including lead times, safety stock levels, and procurement types.
    • Production Order Management: Understand how production orders are managed in SAP, including the impact of material shortages on production scheduling and capacity planning.

    By following these steps, you should be able to identify the cause of the C2389 error and implement a solution to resolve the material shortage issue.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker