Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: C% -
Message number: 071
Message text: Estimates for percentage of completion is not allowed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C%071
- Estimates for percentage of completion is not allowed ?The SAP error message C%071, which states "Estimates for percentage of completion is not allowed," typically occurs in the context of project management and cost accounting within SAP. This error is related to the use of the percentage of completion (POC) method for revenue recognition and cost tracking in projects.
Cause:
- Incorrect Configuration: The project or WBS (Work Breakdown Structure) element may not be configured to allow for percentage of completion estimates. This can happen if the project is set up in a way that does not support POC accounting.
- Project Status: The project or WBS element may be in a status that does not permit POC calculations. For example, if the project is closed or in a status that restricts further updates.
- Missing Settings: The necessary settings for POC accounting may not be activated in the project profile or in the controlling area settings.
- Type of Project: Certain types of projects (like internal projects) may not allow for POC estimates depending on the configuration.
Solution:
- Check Project Configuration: Review the project profile and ensure that it is set up to allow for percentage of completion accounting. This includes checking the settings in the project definition and WBS elements.
- Review Project Status: Ensure that the project or WBS element is in an appropriate status that allows for POC calculations. If the project is closed, you may need to reopen it or create a new project.
- Adjust Settings: If necessary, adjust the settings in the controlling area or project profile to enable POC estimates. This may involve consulting with your SAP administrator or a functional consultant.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration steps related to POC accounting.
- Error Logs: Check the error logs for additional details that may provide more context on why the error is occurring.
Related Information:
If the issue persists after checking these areas, it may be beneficial to involve your SAP support team or a consultant with expertise in SAP project management and controlling.
Get instant SAP help. Sign up for our Free Essentials Plan.
C%070
Enter values between 0 and & only
What causes this issue? In Customizing, you have limited the maximum possible percentage of completion to a value under 100% for the actual progress ...
C%050
No measurement method & defined.
What causes this issue? Measurement method &V1& does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXH...
C%101
Entry combination invalid, enter a correct combination.
What causes this issue? You have entered an invalid combination of parameters for the selection.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG...
C%150
Base field & invalid, enter a correct field.
What causes this issue? Field "&V1&" can not be used as a reference field. The system issues an error message and will not allow yo...
Click on this link to search all SAP messages.