How To Fix BUPA_HIERARCHY047 - BP &1 is already assigned to another node in same time period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BUPA_HIERARCHY - BP Group Hierarchy

  • Message number: 047

  • Message text: BP &1 is already assigned to another node in same time period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BUPA_HIERARCHY047 - BP &1 is already assigned to another node in same time period ?
    The SAP error message BUPA_HIERARCHY047 indicates that a Business Partner (BP) is already assigned to another node in the same hierarchy during the specified time period. This typically occurs when you are trying to assign a business partner to a different node in a hierarchy, but the business partner is already linked to another node for the same timeframe.
    
    Cause: Existing Assignment: The business partner is already assigned to a different node in the hierarchy for the same time period. Hierarchy Structure: The hierarchy structure may not allow multiple assignments of the same business partner to different nodes simultaneously. Time Period Overlap: The time period for which you are trying to assign the business partner overlaps with an existing assignment.
    Solution: To resolve this error, you can take the following steps: Check Existing Assignments: Use transaction code BP to display the business partner and check its current assignments in the hierarchy. Identify the node to which the business partner

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant