Do you have any question about this error?
Message type: E = Error
Message class: BORRT - Messages for regular routes
Message number: 053
Message text: No unique key could be given to schedule &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BORRT053
- No unique key could be given to schedule & ?The SAP error message BORRT053 indicates that there is an issue with scheduling a task or job because the system cannot determine a unique key for the specified schedule. This typically occurs in the context of background job scheduling or when dealing with batch processing in SAP.
Cause:
- Duplicate Entries: The most common cause of this error is the presence of duplicate entries in the scheduling table. If multiple entries exist that match the criteria for scheduling, the system cannot determine which one to use as a unique key.
- Missing Key Fields: The required key fields for the scheduling process may not be filled in correctly, leading to ambiguity.
- Configuration Issues: There may be issues with the configuration of the job or task that is being scheduled, such as incorrect parameters or settings.
- Data Integrity Issues: There could be data integrity issues in the database that prevent the system from identifying a unique record.
Solution:
- Check for Duplicates: Review the entries in the relevant scheduling tables (e.g., TBTCO, TBTCP) to identify any duplicate records. You can use transaction codes like SE16 or SE11 to view the table contents.
- Correct Key Fields: Ensure that all required key fields are populated correctly in the scheduling configuration. This may involve checking the job definition or the parameters being passed.
- Review Job Configuration: Go through the job configuration settings to ensure that they are set up correctly. This includes checking the job name, variant, and any other parameters.
- Data Cleanup: If duplicates or inconsistencies are found, you may need to clean up the data. This could involve deleting or archiving old or unnecessary entries.
- Consult Documentation: Refer to SAP documentation or notes related to job scheduling for any specific guidelines or known issues that might apply to your version of SAP.
- Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the BORRT053 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
BORRT052
Error reading the route data for route &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT051
Internal error occurred
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT054
Node &1 of route &2 does not refer to a receiving point
What causes this issue? An important prerequisite for the use of a schedule is the specification of the route and the route stages. Each vendor shipp...
BORRT055
Route adapted in accordance with route schedule
What causes this issue? Route schedule &V1& was entered.System Response Route &V2& was determined for the route schedule. The delive...
Click on this link to search all SAP messages.