Do you have any question about this error?
Message type: E = Error
Message class: BORRT - Messages for regular routes
Message number: 031
Message text: Route &1 has no stages
An important prerequisite for the use of a schedule is the
specification of a route and the route stages.
Each vendor shipping point is represented by a connection point in the
route stage. The vendor number is maintained as reference in the
connection point.
The receiving point represents the last point in the route and
indicates the end of the route. The receiving point is maintained as
reference in the last connection point.
Entry of the references (vendor or receiving point) is obligatory for a
connection point.
First, maintain the route stages.
To define routes, process the following steps:
Define the transportation connection points and maintain the
appropriate references.
Define the routes and the route stages.
Error message extract from SAP system. Copyright SAP SE.
BORRT031
- Route &1 has no stages ?The SAP error message BORRT031 indicates that a route (in this case, identified by &1) does not have any stages defined. This typically occurs in the context of production planning and control, particularly when working with routing in SAP.
Cause:
- Missing Stages: The route has been created but no stages (operations) have been defined for it. This means that the system cannot find any steps to execute for the production process.
- Incorrect Route Assignment: The route may not be correctly assigned to the material or production order.
- Data Inconsistency: There may be inconsistencies in the data, such as missing entries in the routing tables.
Solution:
Define Stages:
- Go to the routing transaction (e.g., CA01 for creating a routing or CA02 for changing a routing).
- Enter the route number and check if any operations are defined.
- If not, you will need to add the necessary operations/stages to the route.
Check Route Assignment:
- Ensure that the route is correctly assigned to the material master. You can check this in the material master data (transaction MM03) under the "Work Scheduling" view.
- Make sure that the correct routing is assigned to the production order or the material.
Review Data Consistency:
- Check for any inconsistencies in the routing data. You can use transaction C223 to check the routing and see if there are any missing entries.
- If you find inconsistencies, you may need to correct them or recreate the routing.
Consult Documentation:
- Review SAP documentation or help files related to routing and production planning for additional guidance on setting up routes and stages.
Related Information:
If you continue to experience issues after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues related to this error message.
Get instant SAP help. Start your 7-day free trial now.
BORRT030
Point & for route & does not contain a reference
What causes this issue? An important prerequisite for the use of a schedule is the specification of a route and the route stages. Each vendor shippin...
BORRT029
Select a validity period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT032
Route & has no conn. points with reference to the receiving point
What causes this issue? An important prerequisite for the use of a schedule is the specification of a route and the route stages. Each vendor shippin...
BORRT033
Receiving point & is not the end point of route &
What causes this issue? An important prerequisite for the use of a schedule is the specification of a route and the route stages. Each vendor shippin...
Click on this link to search all SAP messages.