Message type: E = Error
Message class: BORRT - Messages for regular routes
Message number: 002
Message text: Schedule & and route & do not match
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BORRT002
- Schedule & and route & do not match ?The SAP error message BORRT002 indicates that there is a mismatch between the schedule and the route for a particular order or operation. This error typically occurs in the context of production planning and control, where the scheduling of operations must align with the defined routing for the production process.
Cause: Mismatch in Scheduling and Routing: The schedule defined for a production order does not align with the routing information. This could be due to: Changes in the production schedule that were not reflected in the routing. Incorrectly defined routing or scheduling parameters. The routing may have been changed after the order was created, leading to inconsistencies. Incorrect Master Data: Issues with master data such as incorrect work center settings, production versions, or material master data can also lead to this error. Capacity Constraints: If the work center has capacity constraints that are not considered in the scheduling, it may lead to a mismatch.
Solution: Check Routing and Schedule:
Get instant SAP help. Sign up for our Free Essentials Plan.
BORRT001
Schedule & already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORGR899
Internal Error: &1 &2 &3 &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT003
Schedule & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT004
Reference route & does not correspond to route &
What causes this issue? The route of the route schedule to be created does not correspond to the route in the source route schedule.System Response ...
Click on this link to search all SAP messages.