Message type: E = Error
Message class: BOR01 - Message class for ETA calculation and route simulation
Message number: 003
Message text: Connection point '&' is invalid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BOR01003
- Connection point '&' is invalid ?The SAP error message BOR01003 indicates that there is an issue with a connection point in the Business Object Repository (BOR). Specifically, the message states that the connection point specified (denoted by '&') is invalid. This can occur in various scenarios, such as when working with Business Object Interfaces, workflows, or when trying to access certain business objects. Causes: Incorrect Connection Point Name: The connection point specified may not exist or may be misspelled.
Configuration Issues: The connection point may not be properly configured in the system. Authorization Issues: The user may not have the necessary authorizations to access the specified connection point. Object Deletion: The business object or connection point may have been deleted or is no longer available in the system. Transport Issues: If the system is in a transport landscape, the connection point may not have been transported correctly. Solutions: Verify Connection Point Name: Check the spelling and ensure that the connection point name is
Get instant SAP help. Sign up for our Free Essentials Plan.
BOR01002
The combination of route '&1' and '&2' as end point is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOR01001
The combination of route '&1' and '&2' as start point is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOR01004
Date '&1' and time stamp '&2' are invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOR01005
Connection points for route & are invalid; edit them
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.