Do you have any question about this error?
Message type: E = Error
Message class: BOR01 - Message class for ETA calculation and route simulation
Message number: 003
Message text: Connection point '&' is invalid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BOR01003
- Connection point '&' is invalid ?The SAP error message BOR01003 indicates that there is an issue with a connection point in the Business Object Repository (BOR). Specifically, the message states that the connection point specified (denoted by '&') is invalid. This can occur in various scenarios, such as when working with Business Object Interfaces, workflows, or when trying to access certain business objects.
Causes:
- Incorrect Connection Point Name: The connection point specified may not exist or may be misspelled.
- Configuration Issues: The connection point may not be properly configured in the system.
- Authorization Issues: The user may not have the necessary authorizations to access the specified connection point.
- Object Deletion: The business object or connection point may have been deleted or is no longer available in the system.
- Transport Issues: If the system is in a transport landscape, the connection point may not have been transported correctly.
Solutions:
- Verify Connection Point Name: Check the spelling and ensure that the connection point name is correct. You can do this by navigating to the relevant business object in the SAP system.
- Check Configuration: Ensure that the connection point is properly configured in the system. This may involve checking the settings in transaction codes like SWO1 (Business Object Builder) or SWFVISU (Workflow Visualization).
- Review Authorizations: Make sure that the user has the necessary authorizations to access the connection point. This can be checked in transaction SU53 (Authorization Check) after the error occurs.
- Check Object Existence: Use transaction SWO1 to check if the business object and its connection points exist and are active.
- Transport Management: If the issue is related to a transport, ensure that all necessary objects have been transported correctly to the target system.
- Consult Documentation: Review SAP documentation or notes related to the specific business object or connection point for any known issues or additional configuration steps.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to reach out to your SAP Basis or development team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
BOR01002
The combination of route '&1' and '&2' as end point is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOR01001
The combination of route '&1' and '&2' as start point is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOR01004
Date '&1' and time stamp '&2' are invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOR01005
Connection points for route & are invalid; edit them
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.