Do you have any question about this error?
Message type: E = Error
Message class: BOM - BOMs (2)
Message number: 525
Message text: BOM for WBS element & being changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BOM525
- BOM for WBS element & being changed ?The SAP error message BOM525 typically indicates that there is an issue with a Bill of Materials (BOM) that is associated with a Work Breakdown Structure (WBS) element. The message usually states that the BOM for the specified WBS element is being changed or is locked, which prevents further modifications or actions.
Cause:
- Concurrent Changes: Another user or process may be currently editing the BOM associated with the WBS element.
- Locking Mechanism: SAP uses a locking mechanism to prevent data inconsistencies. If a BOM is being modified, it will be locked for other users.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the BOM.
- System Configuration: There may be specific configurations or settings in the system that restrict changes to BOMs linked to WBS elements.
Solution:
- Check for Locks: Use transaction code
SM12
to check for any locks on the BOM. If you find a lock that is no longer needed, you can delete it (if you have the necessary authorizations).- Wait for Release: If another user is editing the BOM, you may need to wait until they finish and release the lock.
- Review Authorizations: Ensure that you have the necessary authorizations to edit the BOM. You may need to contact your SAP security team if you suspect authorization issues.
- Check Configuration: Review the system configuration related to BOMs and WBS elements to ensure that there are no restrictions in place that would prevent changes.
- Use Transaction Codes: You can use transaction codes like
CS02
(Change BOM) to attempt to access the BOM again after confirming that it is not locked.Related Information:
CS01
(Create BOM), CS02
(Change BOM), and CS03
(Display BOM) for managing BOMs.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting steps.
Get instant SAP help. Start your 7-day free trial now.
BOM524
BOM being created for WBS element &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOM517
Inconsistency of data (inform person responsible) & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOM548
No valid items found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOM557
BOM already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.