Do you have any question about this error?
Message type: E = Error
Message class: BA - Data Archiving
Message number: 316
Message text: Scheduling job (SUB job) for continuation: &1
To continue the last selected &V3& interrupted archiving sessions,
scheduling job (SUB job) &V1& was scheduled (with ID &V2&).
Error message extract from SAP system. Copyright SAP SE.
BA316
- Scheduling job (SUB job) for continuation: &1 ?The SAP error message BA316 typically indicates an issue with scheduling a background job, specifically a sub-job that is part of a continuation process. This error can arise in various scenarios, often related to job dependencies, resource availability, or configuration issues.
Cause:
- Job Dependencies: The sub-job may depend on the completion of a previous job that has not yet finished or has failed.
- Resource Availability: There may not be enough resources (e.g., background processing capacity) available to execute the job.
- Configuration Issues: There could be misconfigurations in the job scheduling settings or in the job itself.
- Job Status: The main job might be in a status that does not allow for the continuation of sub-jobs (e.g., it might be in a canceled or error state).
- System Load: High system load or performance issues could prevent the job from being scheduled.
Solution:
- Check Job Dependencies: Review the job log of the main job to ensure that all prerequisite jobs have completed successfully. If a prerequisite job has failed, resolve that issue first.
- Monitor Background Jobs: Use transaction codes like
SM37
to monitor the status of background jobs. Look for any jobs that are currently running or have failed.- Increase Background Processing Capacity: If resource availability is an issue, consider increasing the number of background work processes in the system configuration.
- Review Job Configuration: Check the configuration of the job and its sub-jobs to ensure that they are set up correctly. Look for any misconfigurations that could prevent scheduling.
- Check System Performance: If the system is under heavy load, consider scheduling the job during off-peak hours or optimizing system performance.
- Re-schedule the Job: If the main job has completed successfully, try to manually re-schedule the sub-job.
Related Information:
SM37
- Monitor Background JobsSM36
- Define Background JobSM21
- System LogIf the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
BA315
Session &3 in write job &1 continued with with ID &2
System Response To continue archiving session &V3&, the write job &V1& (ID &V2&) was successfully scheduled by the current su...
BA314
Postprocessing job &1 scheduled with ID &2
System Response Postprocessing job &V1& (ID &V2& ) was successfully scheduled by the current submit job &V3& (ID &V4&...
BA317
Interruption requested for &1 archiving sessions
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BA318
Archiving object &1 cannot be interrupted
What causes this issue? As the current archiving object is not marked as interruptible, there are no object-specific archive sessions for selection t...
Click on this link to search all SAP messages.