Do you have any question about this error?
Message type: E = Error
Message class: AUR - Unbilled Revenue Reporting and Mass Simulation
Message number: 078
Message text: You are not permitted to maintain key dates for simulation period &1
<DS:DE.SIMRUNID>Simulation period</> &v1& uses a
<DS:DE.BISIMTYPE>simulation type</>, for which the
<DS:DE.CHECKKEYDATE>Check Key Date</> indicator is not set. However, the
<DS:DE.KEYDATE_MSIM>Key Date of Mass Simulation</> is not initial.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
This situation can only arise if you use a different simulation type
subsequently in the simulation period, or if you change the simulation
type itself. We recommend that you do not make such changes.
Delete the simulation period and create it again from new.
Error message extract from SAP system. Copyright SAP SE.
AUR078
- You are not permitted to maintain key dates for simulation period &1 ?The SAP error message AUR078 indicates that a user is not permitted to maintain key dates for a simulation period in the system. This typically occurs in the context of planning or simulation activities within SAP, particularly in modules like SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP).
Cause:
- Authorization Issues: The user may not have the necessary authorizations to maintain key dates for the specified simulation period. This is often due to role assignments or missing permissions in the user profile.
- Configuration Settings: The system may be configured to restrict changes to key dates during certain periods or under specific conditions.
- Simulation Period Restrictions: The simulation period may be locked or restricted for changes, either due to business rules or system settings.
Solution:
Check User Authorizations:
- Verify the user's roles and authorizations in the SAP system. Ensure that the user has the necessary permissions to maintain key dates for the simulation period.
- You may need to consult with your SAP security team to adjust the user's roles or permissions.
Review Configuration Settings:
- Check the configuration settings related to the simulation period in the relevant SAP module. Ensure that the settings allow for changes to key dates.
- If necessary, consult with your SAP configuration team to understand any restrictions that may be in place.
Unlock Simulation Period:
- If the simulation period is locked, you may need to unlock it or change the status to allow for modifications. This may require administrative access or specific authorizations.
Consult Documentation:
- Review SAP documentation or help resources related to the specific module you are working with. This can provide insights into any specific settings or configurations that may be causing the issue.
Contact SAP Support:
- If the issue persists after checking authorizations and configurations, consider reaching out to SAP support for further assistance. They can provide more detailed insights based on the specific system setup.
Related Information:
/SAPAPO/SDP94
for planning or /SAPAPO/SDP94
for simulation activities.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AUR077
'Check Key Date' indicator not permitted for simulation type &1
What causes this issue? You cannot choose the <DS:DE.CHECKKEYDATE>Check Key Date</> indicator for simulation type &V1&.System Res...
AUR076
Simulation period &1: &2 is not a valid key date
What causes this issue? In simulation period &v1&, you are using a <DS:DE.BISIMTYPE>simulation type</>, for which the <DS:DE.C...
AUT000
A critical error occurred while the graphics were built for the control
What causes this issue? The system could not start due to an internal error.System Response The system issues an error message and will not allow yo...
AUT001
Logging in system &1 is active for all clients
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.