Do you have any question about this error?
Message type: E = Error
Message class: ATP_BOP_LOGIC -
Message number: 033
Message text: &1 schedule lines of selected requirements also selected for processing.
A number of additional schedule lines for the originally specified
requirements have also been selected for processing. Some schedule
lines, which had not been selected previously, have been subsequently
assigned to a confirmation strategy in backorder processing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE ATP_BOP_LOGIC_034 OBJECT DOKU ID TX LANGUAGE ENError message extract from SAP system. Copyright SAP SE.
ATP_BOP_LOGIC033
- &1 schedule lines of selected requirements also selected for processing. ?The SAP error message ATP_BOP_LOGIC033 indicates that there are schedule lines of selected requirements that have also been selected for processing. This typically occurs in the context of Advanced Planning and Optimization (APO) or in the context of Available-to-Promise (ATP) checks, where the system is trying to allocate stock to fulfill a demand but encounters conflicting schedule lines.
Cause:
- Conflicting Schedule Lines: The error usually arises when there are multiple schedule lines for the same material that are being processed simultaneously, leading to conflicts in allocation.
- Overlapping Requirements: If the requirements for a material overlap in terms of dates or quantities, the system may not be able to determine how to allocate stock appropriately.
- Configuration Issues: There may be issues with the configuration of the ATP settings or the way the planning is set up in the system.
Solution:
- Review Schedule Lines: Check the schedule lines for the material in question. Ensure that there are no overlapping or conflicting requirements that could cause the error.
- Adjust Requirements: If possible, adjust the requirements to eliminate conflicts. This may involve changing delivery dates or quantities.
- Check ATP Configuration: Review the ATP configuration settings in your SAP system. Ensure that the settings are correctly configured to handle the requirements and schedule lines.
- Use the ATP Monitor: Utilize the ATP monitor to analyze the situation further. This tool can help identify which schedule lines are causing the conflict and provide insights into how to resolve it.
- Consult Documentation: Refer to SAP documentation or notes related to ATP and BOP (Business Object Processing) for additional guidance on handling this error.
- Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP support for assistance.
Related Information:
/SAPAPO/ATP
or /SAPAPO/SDP94
to analyze the ATP situation.By following these steps, you should be able to identify the cause of the ATP_BOP_LOGIC033 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
ATP_BOP_LOGIC032
Some reqs remain unprocessed as requirement segment is not specified.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ATP_BOP_LOGIC031
Fallback variant &1 is triggered.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ATP_BOP_LOGIC034
Run has completed for variant &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ATP_BOP_LOGIC035
BOP run started.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.