Do you have any question about this error?
Message type: E = Error
Message class: /ATL/GENERAL -
Message number: 028
Message text: Base period Adjusment date was not given. report is terminated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ATL/GENERAL028
- Base period Adjusment date was not given. report is terminated ?The SAP error message
/ATL/GENERAL028 Base period Adjustment date was not given. report is terminated
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with planning and adjustment processes. This error indicates that a required date for the base period adjustment has not been provided, which is necessary for the system to execute the report or process.Cause:
- Missing Input: The adjustment date for the base period is not specified in the selection criteria or input parameters when executing the report.
- Configuration Issues: There may be configuration settings in the system that are not set up correctly, leading to the requirement for an adjustment date not being met.
- User Error: The user may have overlooked entering the necessary date in the report parameters.
Solution:
- Provide Adjustment Date: Ensure that you enter the base period adjustment date in the selection screen or input parameters when executing the report. This is often a mandatory field.
- Check Configuration: Review the configuration settings related to the report or process to ensure that all necessary parameters are correctly defined.
- Consult Documentation: Refer to the SAP documentation or help files related to the specific report you are running to understand the required fields and their significance.
- User Training: If this is a recurring issue, consider providing additional training to users on how to properly execute the report and what inputs are required.
Related Information:
By ensuring that the base period adjustment date is provided and verifying the configuration, you should be able to resolve the error and successfully execute the report.
Get instant SAP help. Start your 7-day free trial now.
/ATL/GENERAL027
Index ID is missing; report is terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ATL/GENERAL026
To period Adjusment date was not given. report is terminated
What causes this issue? You run a report which uses Adjusted data. therefor , the parameter 'To Period Adjusment date' must be given. in th...
/ATL/GENERAL029
Assign a controlling area to company & and business area &
What causes this issue? During the execution of GLX report , A request to adjust budget data has occured . Therefor , the system called up The EXIT R...
/ATL/GENERAL030
Assign a base date to controlling area &, version &, and year &
What causes this issue? During the execution of GLX report, a request to adjust budget data has occured. Therefore, the system called up the EXIT ROU...
Click on this link to search all SAP messages.