Do you have any question about this error?
Message type: E = Error
Message class: ARUN_MAIN -
Message number: 039
Message text: Item &1 is assigned; changing &2 in sch. line &3 will unassign the item.
The material is relevant to Supply Assignment (ARun) and an assignment
exists for this document item.
The document item will be unassigned for one of the following reasons:
You have defined the Customization for the document item under
<LS>Cross-Application Components > Advanced Available-to-Promise (aATP)
> Supply Assignment (ARun) > Cross-Applications > Purchase Order
Handling</>, changing the document item will unassign the order. You
have set the field check as W = Warnings Before an Order is Unassigned.
You have not defined a rule to unassign orders under
<LS>Cross-Application Components > Advanced Available-to-Promise (aATP)
> Supply Assignment (ARun) > Cross-Applications > Purchase Order
Handling.</> The item will be unassigned automatically.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Define rules to unassign orders for an application type in Customizing
under <LS>Cross-Application Components > Advanced Available-to-Promise
(aATP) > Supply Assignment (ARun) > Cross-Applications</>.
By defining a rule to unassign orders, you specify exactly how the
system should react when an application type is modified (for example,
change in requirement date, goods receipt date, plant, storage location,
and so on).
You set the appropriate fields listed in the application type in
Customizing. For field checks, you can assign one of the following
options.
o,,N = No Action
o,,W = Warnings Before an Order is Unassigned
o,,E = Change Not Permitted
Depending on the selected parameter, the system decides how and when the
quantities should be unassigned.
Error message extract from SAP system. Copyright SAP SE.
ARUN_MAIN039
- Item &1 is assigned; changing &2 in sch. line &3 will unassign the item. ?The SAP error message ARUN_MAIN039 indicates that there is an issue with the assignment of an item in a scheduling line. Specifically, it means that the item you are trying to change (indicated by &2) in the scheduling line (indicated by &3) is currently assigned to another scheduling line (indicated by &1). Changing the scheduling line will result in the unassignment of the item, which may not be the desired action.
Cause:
- Item Assignment Conflict: The item is already assigned to a different scheduling line, and the system is preventing you from making changes that would lead to unassigning it.
- Data Integrity: SAP enforces data integrity rules to ensure that items are not inadvertently unassigned, which could lead to inconsistencies in the scheduling and planning processes.
Solution:
- Review Assignments: Check the current assignments of the item in question. You can do this by navigating to the relevant transaction (e.g., MD04 for stock/requirements list) to see where the item is currently assigned.
- Decide on Changes: Determine if you really need to change the scheduling line. If the change is necessary, you may need to first unassign the item from its current scheduling line before making the desired changes.
- Unassign the Item: If you decide to proceed with the change, unassign the item from the current scheduling line first. This can typically be done in the scheduling line details.
- Make the Change: After unassigning, you can then proceed to change the scheduling line as needed.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant module (e.g., MM, SD, PP) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
ARUN_MAIN038
ARun type is not an Immediate ARun type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ARUN_MAIN037
Enter a valid value in the Assign Batches field for material &1, DC &2
What causes this issue? You have entered an invalid value in the <ZK>Assign Batches</> field.System Response The system issues an error ...
ARUN_MAIN040
Item &1 is assigned and cannot be deleted or blocked (see long text &3)
What causes this issue? The material is relevant to Supply Assignment (ARun) and an assignment exists for this document item. You cannot change the d...
ARUN_MAIN041
Item &1 is assigned; cannot delete schedule line &2 (see long text &3)
What causes this issue? The material is relevant to Supply Assignment (ARun) and an assignment exists for this document item. You cannot change the d...
Click on this link to search all SAP messages.