How To Fix ARUN_MAIN039 - Item &1 is assigned; changing &2 in sch. line &3 will unassign the item.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: ARUN_MAIN -

  • Message number: 039

  • Message text: Item &1 is assigned; changing &2 in sch. line &3 will unassign the item.

  • Show details Hide details
  • What causes this issue?

    The material is relevant to Supply Assignment (ARun) and an assignment
    exists for this document item.
    The document item will be unassigned for one of the following reasons:
    You have defined the Customization for the document item under
    <LS>Cross-Application Components > Advanced Available-to-Promise (aATP)
    > Supply Assignment (ARun) > Cross-Applications > Purchase Order
    Handling</>, changing the document item will unassign the order. You
    have set the field check as W = Warnings Before an Order is Unassigned.
    You have not defined a rule to unassign orders under
    <LS>Cross-Application Components > Advanced Available-to-Promise (aATP)
    > Supply Assignment (ARun) > Cross-Applications > Purchase Order
    Handling.</> The item will be unassigned automatically.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Define rules to unassign orders for an application type in Customizing
    under <LS>Cross-Application Components > Advanced Available-to-Promise
    (aATP) > Supply Assignment (ARun) > Cross-Applications</>.
    By defining a rule to unassign orders, you specify exactly how the
    system should react when an application type is modified (for example,
    change in requirement date, goods receipt date, plant, storage location,
    and so on).
    You set the appropriate fields listed in the application type in
    Customizing. For field checks, you can assign one of the following
    options.
    o,,N = No Action
    o,,W = Warnings Before an Order is Unassigned
    o,,E = Change Not Permitted
    Depending on the selected parameter, the system decides how and when the
    quantities should be unassigned.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message ARUN_MAIN039 - Item &1 is assigned; changing &2 in sch. line &3 will unassign the item. ?

    The SAP error message ARUN_MAIN039 indicates that there is an issue with the assignment of an item in a scheduling line. Specifically, it means that the item you are trying to change (indicated by &2) in the scheduling line (indicated by &3) is currently assigned to another scheduling line (indicated by &1). Changing the scheduling line will result in the unassignment of the item, which may not be the desired action.

    Cause:

    1. Item Assignment Conflict: The item is already assigned to a different scheduling line, and the system is preventing you from making changes that would lead to unassigning it.
    2. Data Integrity: SAP enforces data integrity rules to ensure that items are not inadvertently unassigned, which could lead to inconsistencies in the scheduling and planning processes.

    Solution:

    1. Review Assignments: Check the current assignments of the item in question. You can do this by navigating to the relevant transaction (e.g., MD04 for stock/requirements list) to see where the item is currently assigned.
    2. Decide on Changes: Determine if you really need to change the scheduling line. If the change is necessary, you may need to first unassign the item from its current scheduling line before making the desired changes.
    3. Unassign the Item: If you decide to proceed with the change, unassign the item from the current scheduling line first. This can typically be done in the scheduling line details.
    4. Make the Change: After unassigning, you can then proceed to change the scheduling line as needed.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04 (Stock/Requirements List), MD02 (MD Planning), or any other relevant transaction where scheduling lines are managed.
    • User Authorization: Ensure that you have the necessary authorizations to make changes to scheduling lines and item assignments.
    • Consult Documentation: Refer to SAP documentation or help files for more detailed instructions on managing scheduling lines and item assignments.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address specific issues.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant module (e.g., MM, SD, PP) for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant