Do you have any question about this error?
Message type: E = Error
Message class: ARUN_MAIN -
Message number: 020
Message text: Cannot set Adv. plan. Ind. and ARun fields together for matl &1, DC &2
You have defined a value for <ZK>Advanced Planning Indicator</> for a
material relevant to Supply Assignment (ARun) or you have set the ARun
field for a material with advanced planning indicator selected.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
For a material, define a value for either the <ZK>Advanced Planning
Indicator</> or <ZK>ARun </>field. You cannot define both the fields
together.
Error message extract from SAP system. Copyright SAP SE.
ARUN_MAIN020
- Cannot set Adv. plan. Ind. and ARun fields together for matl &1, DC &2 ?The SAP error message ARUN_MAIN020 indicates that there is a conflict in the settings for the Advanced Planning Indicator and the ARun fields for a specific material and distribution center (DC). This error typically arises in the context of Advanced Planning and Optimization (APO) or similar planning modules within SAP.
Cause:
The error occurs when both the Advanced Planning Indicator and the ARun fields are set simultaneously for a material in a specific distribution center. This is not allowed because these two fields are mutually exclusive; you can only use one or the other for planning purposes.
Solution:
To resolve this error, you need to check the settings for the material and distribution center in question. Here are the steps you can take:
Check Material Master Data:
- Go to the material master data for the specific material (transaction code: MM03).
- Navigate to the relevant views (e.g., MRP, MRP 2) and check the settings for the Advanced Planning Indicator and ARun fields.
Adjust Settings:
- If both fields are set, you need to decide which one you want to use based on your planning requirements.
- Clear the field that you do not want to use. For example, if you want to use the Advanced Planning Indicator, ensure that the ARun field is blank.
Save Changes:
- After making the necessary adjustments, save the changes to the material master.
Re-run the Planning Process:
- After correcting the settings, re-run the planning process that triggered the error to see if the issue is resolved.
Related Information:
Transaction Codes:
Documentation:
Consult with SAP Basis or Functional Team:
By following these steps, you should be able to resolve the ARUN_MAIN020 error and continue with your planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
ARUN_MAIN019
Enter a valid value in the ARun field for material &1, distr. channel &2
What causes this issue? You have entered an invalid value in the Supply Assignment (ARun) field.System Response The system issues an error message a...
ARUN_MAIN018
Cannot set Adv. plan. Ind. and ARun fields together for matl &1, plant &2
What causes this issue? You have defined a value for advanced planning indicator for a material relevant to Supply Assignment (ARun) or you have set ...
ARUN_MAIN021
Cannot define ôAssign Batchesö field for material &1, DC &2
What causes this issue? You have not met the following conditions: You have changed the value from "1" (Assign Batches) to " " (D...
ARUN_MAIN022
Item &1 is assigned; item will be completely unassigned if deleted
What causes this issue? The document item will be unassigned for one of the following reasons and changing the inbound delivery will unassign the ite...
Click on this link to search all SAP messages.