How To Fix AREN021 - Resource pool adjusted to &1 tasks


AREN021 - Overview

  • Message type: E = Error

  • Message class: AREN - Messages - Archiving Engine

  • Message number: 021

  • Message text: Resource pool adjusted to &1 tasks

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AREN021 - Resource pool adjusted to &1 tasks ?
    The SAP error message AREN021, which states "Resource pool adjusted to &1 tasks," typically relates to the configuration of resource pools in the SAP system, particularly in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP). This message indicates that the system has automatically adjusted the number of tasks in a resource pool based on certain criteria or limitations.
    
    Cause: Resource Pool Configuration: The resource pool may have been configured with a maximum number of tasks that can be processed simultaneously. If the system determines that the current workload exceeds this limit, it will adjust the number of tasks accordingly. Capacity Constraints: The system may have identified that the available capacity of the resources is insufficient to handle the current number of tasks, leading to an automatic adjustment. System Performance: To maintain optimal system performance, the SAP system may limit the number of tasks being processed in parallel.
    Solution: Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author