Do you have any question about this error?
Message type: E = Error
Message class: APPL_PROC_HUB_PR - Message Class for Purchase Requisition Extraction
Message number: 032
Message text: Job scheduled for delta import is canceled
The job scheduled for delta import has been canceled because the
previous delta import containing the same parameter is still in process.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
APPL_PROC_HUB_PR032
- Job scheduled for delta import is canceled ?The SAP error message APPL_PROC_HUB_PR032 indicates that a job scheduled for delta import has been canceled. This can occur in various scenarios, particularly in the context of SAP Process Integration (PI) or SAP Process Orchestration (PO) environments, where delta imports are used to synchronize data between systems.
Causes:
- Job Cancellation: The job may have been manually canceled by a user or an administrator.
- System Resource Issues: Insufficient system resources (CPU, memory, etc.) can lead to job failures or cancellations.
- Configuration Issues: Incorrect configuration settings in the delta import job can cause it to fail.
- Network Issues: Network interruptions or connectivity problems between systems can lead to job cancellations.
- Data Issues: Problems with the data being imported (e.g., data integrity issues, missing data) can cause the job to fail.
- Timeouts: The job may have exceeded the allowed execution time, leading to an automatic cancellation.
Solutions:
- Check Job Logs: Review the job logs for detailed error messages that can provide insights into why the job was canceled.
- Restart the Job: If the job was canceled manually or due to a temporary issue, you can try to restart the delta import job.
- Resource Monitoring: Monitor system resources to ensure that there are enough resources available for the job to run successfully.
- Configuration Review: Verify the configuration settings for the delta import job to ensure they are correct.
- Network Stability: Check the network connection between the systems involved in the delta import to ensure stability.
- Data Validation: Validate the data being imported to ensure there are no integrity issues or missing records.
- Increase Timeout Settings: If timeouts are an issue, consider increasing the timeout settings for the job.
Related Information:
SM37
to monitor job status and logs, and SLG1
for application logs.By following these steps, you should be able to diagnose and resolve the issue related to the APPL_PROC_HUB_PR032 error message.
Get instant SAP help. Start your 7-day free trial now.
APPL_PROC_HUB_PR031
Cannot set up a recurring job for full import
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APPL_PROC_HUB_PR030
Job scheduled for delta import is canceled
What causes this issue? Job scheduled for delta import is canceled as the full import was not performed.System Response The system issues an error m...
APPL_PROC_HUB_PR033
Job scheduled for full import is canceled
What causes this issue? The job scheduled for full import has been canceled because the previous job for full import containing the same set of param...
APPL_PROC_HUB_PR034
&1 is not a valid connected system for P2O Extraction
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.