How To Fix APO_BAPI_SPP062 - Possible period: Start &1 - End &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: APO_BAPI_SPP - Messages in SPP BAPIs

  • Message number: 062

  • Message text: Possible period: Start &1 - End &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message APO_BAPI_SPP062 - Possible period: Start &1 - End &2 ?
    The SAP error message APO_BAPI_SPP062 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the planning period specified in a BAPI (Business Application Programming Interface) call related to Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS).
    
    Cause: The error message indicates that the specified planning period is not valid. This can happen due to several reasons: Invalid Dates: The start and end dates provided in the BAPI call may not fall within the valid planning horizon defined in the system. Planning Version Issues: The planning version being used may not be active or may not have data for the specified period. Locking Issues: The planning area may be locked for the specified period, preventing any changes or updates.
    Configuration Issues: There may be configuration settings in the APO system that restrict the planning periods.
    Solution: To resolve the APO_BAPI_SPP062 error, you can take the following steps: Check Dates:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker