How To Fix APO_BAPI_SPP062 - Possible period: Start &1 - End &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: APO_BAPI_SPP - Messages in SPP BAPIs

  • Message number: 062

  • Message text: Possible period: Start &1 - End &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message APO_BAPI_SPP062 - Possible period: Start &1 - End &2 ?

    The SAP error message APO_BAPI_SPP062 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the planning period specified in a BAPI (Business Application Programming Interface) call related to Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS).

    Cause:

    The error message indicates that the specified planning period is not valid. This can happen due to several reasons:

    1. Invalid Dates: The start and end dates provided in the BAPI call may not fall within the valid planning horizon defined in the system.
    2. Planning Version Issues: The planning version being used may not be active or may not have data for the specified period.
    3. Locking Issues: The planning area may be locked for the specified period, preventing any changes or updates.
    4. Configuration Issues: There may be configuration settings in the APO system that restrict the planning periods.

    Solution:

    To resolve the APO_BAPI_SPP062 error, you can take the following steps:

    1. Check Dates: Verify that the start and end dates provided in the BAPI call are correct and fall within the valid planning horizon. You can check the planning horizon settings in the APO configuration.

    2. Review Planning Version: Ensure that the planning version you are using is active and has data for the specified period. You can check this in the planning book or through the relevant transaction codes.

    3. Unlock Planning Area: If the planning area is locked, you may need to unlock it or wait until the lock is released. You can check for locks using transaction codes like SM12.

    4. Configuration Review: Review the configuration settings in the APO system to ensure that there are no restrictions on the planning periods. This may involve checking the settings in the planning area or the planning book.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific BAPI you are using for any additional requirements or constraints.

    6. Debugging: If you have access to development tools, you can debug the BAPI call to see the exact parameters being passed and identify any discrepancies.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/SDP94 (for planning book) and /SAPAPO/MC62 (for planning area).
    • SAP Notes: Check SAP Notes for any known issues or patches related to the BAPI or the error message.
    • APO Configuration: Understanding the configuration of your APO system, including planning areas, versions, and horizons, is crucial for troubleshooting.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or APO functional team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker