Message type: E = Error
Message class: APO_BAPI_SPP - Messages in SPP BAPIs
Message number: 055
Message text: Horizon cannot be calculated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
APO_BAPI_SPP055
- Horizon cannot be calculated ?The SAP error message APO_BAPI_SPP055: Horizon cannot be calculated typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when working with Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS). This error indicates that the system is unable to calculate the planning horizon for a specific planning run or operation. Causes: Incorrect Configuration: The planning horizon may not be properly defined in the configuration settings. This can include settings related to the planning version, time buckets, or the overall planning horizon in the system. Missing Master Data: Required master data such as product master, location master, or resource master may be incomplete or missing, which can prevent the calculation of the planning horizon. Time Period Issues: The time periods defined for the planning run may not align with the available data or may exceed the limits set in the system. Data Consistency Issues: There may be inconsistencies in the
Get instant SAP help. Sign up for our Free Essentials Plan.
APO_BAPI_SPP054
Location product &1 &2, supplier &3, date &4:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI_SPP053
Date &1 does not match the end of the period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI_SPP056
Time series ID not specified; use &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI_SPP057
Internal notes were not transferred
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.