Do you have any question about this error?
Message type: E = Error
Message class: APO_BAPI - Message Class for APO BAPIs
Message number: 150
Message text: No plan could be determined for key &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
APO_BAPI150
- No plan could be determined for key &1 ?The SAP error message "APO_BAPI150 No plan could be determined for key &1" typically occurs in the context of Advanced Planning and Optimization (APO) when a planning operation is attempted, but the system cannot find a valid planning object or plan for the specified key. This can happen in various scenarios, such as during the execution of a BAPI (Business Application Programming Interface) or when trying to access planning data.
Causes:
- Missing Planning Object: The specified key does not correspond to any existing planning object in the system.
- Incorrect Key Format: The key provided may not be in the correct format or may be incomplete.
- Data Not Loaded: The relevant planning data may not have been loaded into the system, or the planning area may not be activated.
- Configuration Issues: There may be configuration issues in the APO system that prevent the determination of the plan.
- Authorization Issues: The user may not have the necessary authorizations to access the planning object.
Solutions:
- Verify the Key: Check the key provided in the error message to ensure it is correct and corresponds to an existing planning object.
- Check Planning Area: Ensure that the planning area is correctly configured and activated. You can do this in the APO system under the relevant configuration settings.
- Load Data: If the planning data is missing, ensure that the necessary data is loaded into the system. This may involve running data extraction or loading processes.
- Review Configuration: Check the configuration settings in the APO system to ensure that everything is set up correctly for the planning process you are trying to execute.
- Authorization Check: Ensure that the user executing the operation has the necessary authorizations to access the planning object.
- Consult Logs: Review system logs or application logs for additional details that may provide more context about the error.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or APO functional team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
APO_BAPI149
External product name for ID &1 can not be defined clearly
What causes this issue? In the system there are two mapping entries available for the product ID with different business system groups. It is therefo...
APO_BAPI148
Document recipient &1 and turnover recipient &2 are different
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI151
No activity could be determined for actid &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI152
The tables Logical_Component and Comp_Product are not index synchronized
What causes this issue? For SNP and DP plans the tables Logical_Component and Comp_Product must be transmitted index synchronised.System Response Th...
Click on this link to search all SAP messages.