Message type: E = Error
Message class: AP - Investment program messages
Message number: 208
Message text: Measure originates in a different logical system
You are in logical system &V1& and have tried to attach a measure from
logical system &V2& to an investment program position.
However, you can only attach measures to the investment program if
those measures are in the same logical system as the investment program
itself.
The assignment is not allowed.
Error message extract from SAP system. Copyright SAP SE.
AP208
- Measure originates in a different logical system ?The SAP error message AP208 ("Measure originates in a different logical system") typically occurs in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP) when there is an attempt to use a measure (like a key figure) that is defined in a different logical system than the one currently being used. This can happen in scenarios involving data transfer or integration between different SAP systems or environments.
Cause: Logical System Configuration: The measure you are trying to access or manipulate is defined in a logical system that is different from the one you are currently working in. This can happen if you have multiple SAP systems (like a development system, quality assurance system, and production system) and the data is not synchronized properly. Data Transfer Issues: If data is being transferred between systems (e.g., through CIF - Core Interface), and the measure is not correctly mapped or
Get instant SAP help. Sign up for our Free Essentials Plan.
AP207
An assignment already exists
What causes this issue? You want to assign a measure or an appropriation request (100%) to a program position. There is already an existing assignmen...
AP206
Budget category &1 not available
What causes this issue? The investment program belongs to program type &V2&. However, budget category &V1& is not allowed for progra...
AP209
Order &1 is already assigned
What causes this issue? Order &V1& was already assigned to the current program position under budget category &V2&.System Response Y...
AP210
WBS element &1 is already assigned
What causes this issue? The WBS element &V1& was already assigned to the current program position under budget category &V2&.System R...
Click on this link to search all SAP messages.