How To Fix AP080 - WBS element &1 is not part of project &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP - Investment program messages

  • Message number: 080

  • Message text: WBS element &1 is not part of project &2

  • Show details Hide details
  • What causes this issue?

    You have specified project &V2& and initial WBS element &V1&. The
    system thus tries to select all WBS elements
    which belong to project &V2&, and
    are on the same hierarchy level as WBS element or are subordinate to it
    WBS element &V1& must also be part of project &V2&. It does not.

    How to fix this error?

    Correct your input.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AP080 - WBS element &1 is not part of project &2 ?

    The SAP error message AP080 indicates that a Work Breakdown Structure (WBS) element is not part of the specified project. This error typically occurs when you are trying to perform an operation (such as posting costs, creating a transaction, or assigning resources) on a WBS element that is not correctly linked to the project in the system.

    Cause:

    1. Incorrect WBS Element: The WBS element you are trying to use may not be correctly assigned to the project.
    2. Project Structure: The project structure may have changed, and the WBS element may have been deleted or is no longer valid.
    3. Authorization Issues: You may not have the necessary authorizations to access the WBS element or project.
    4. Data Entry Errors: There may be a typographical error in the WBS element or project number being used.

    Solution:

    1. Verify WBS Element: Check if the WBS element exists and is correctly assigned to the project. You can do this by navigating to the project structure in SAP (using transaction codes like CJ20N or CJ03).
    2. Check Project Assignment: Ensure that the WBS element is part of the project by reviewing the project hierarchy. If it is not, you may need to create a new WBS element or reassign the existing one.
    3. Review Authorizations: Ensure that you have the necessary permissions to access the project and WBS element. If not, contact your SAP security administrator.
    4. Correct Data Entry: Double-check the WBS element and project numbers for any typographical errors. Ensure that you are using the correct identifiers.
    5. Consult Documentation: If the issue persists, refer to SAP documentation or consult with your SAP support team for further assistance.

    Related Information:

    • Transaction Codes: Common transaction codes related to project management in SAP include:
      • CJ20N: Project Builder
      • CJ03: Display WBS Element
      • CJ02: Change WBS Element
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Training and Documentation: Consider reviewing SAP training materials or documentation related to project management and WBS elements for a better understanding of how they are structured and managed in SAP.

    By following these steps, you should be able to resolve the AP080 error and ensure that your WBS elements are correctly linked to their respective projects.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author