Do you have any question about this error?
Message type: E = Error
Message class: AO - Appropriation requests - Master data / Customizing
Message number: 215
Message text: Error while calculating the net present value
An error occurred during calculation of the net present value.
The yield curve for determining the net present value is not completely
maintained. Possible causes are:
Evaluation type IM01 does not exist (table ATSYC).
Yield curve types 9990 (bid) and 9991 (ask) have not been created
(table JBD14) for the currency of the controlling area of the
appropriation request.
Reference interest rates have not been created for the yield curves
(tables T056R and JBD15).
Interest rates are not maintained for the complete planning time period
for the reference interest rates.
Under certain circumstances, the standard exchange rate types 'G' and
'B' may be inconsistent.
RESET N1
Check your Customizing settings:
SAP supplies the evaluation types.
Remember, SAP supplies the evaluation types in client 000. You have to
copy them into your working clients. If you do not have them in your
system, you can create them in Customizing for the Treasury component
(Treasury Management -> Market Risk Management -> Evaluations -> Define
Default Settings). Create evaluation type IM01 with bid yield curve
type 9990 and ask yield curve type 9991.
In Customizing for appropriation requests (under Planning), create a
bid yield curve type 9990 and an ask yield curve type for the currency
of the controlling area of the appropriation request.
Create at least one reference interest rate for each yield curve.
Maintain the reference rates, starting at the minimum fron the point at
which you you have planned costs or revenue.
Check Customizing of the exchange rate types 'G' and 'B' in the IMG
under Global Settings -> Currencies.
Error message extract from SAP system. Copyright SAP SE.
AO215
- Error while calculating the net present value ?The SAP error message AO215, which states "Error while calculating the net present value," typically occurs in the context of Asset Accounting (FI-AA) when there is an issue with the calculation of the net present value (NPV) for an asset. This error can arise due to various reasons, including incorrect configuration, missing data, or issues with the asset master record.
Causes of AO215 Error
Missing or Incorrect Data: The asset master record may have missing or incorrect data, such as acquisition costs, useful life, or depreciation parameters.
Configuration Issues: There may be issues with the configuration settings in Asset Accounting, such as the valuation area or the depreciation areas not being set up correctly.
Currency Issues: If there are inconsistencies in currency settings (e.g., local currency vs. group currency), it can lead to calculation errors.
Inconsistent or Missing Valuation Methods: The valuation methods used for calculating NPV may not be defined or may be inconsistent with the asset's characteristics.
Technical Issues: There could be underlying technical issues, such as program errors or system bugs.
Solutions to AO215 Error
Check Asset Master Data: Review the asset master record for completeness and accuracy. Ensure that all required fields are filled out correctly, including acquisition costs, useful life, and depreciation parameters.
Review Configuration Settings: Verify the configuration settings in the Asset Accounting module. Ensure that the valuation areas and depreciation areas are correctly set up.
Currency Settings: Check the currency settings for the asset and ensure that they are consistent. Make sure that the local currency and group currency are correctly defined.
Valuation Methods: Ensure that the valuation methods for the asset are correctly defined and consistent with the asset's characteristics.
Run Consistency Checks: Use transaction codes like OABN (for asset accounting) to run consistency checks on the asset data.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error. There may be patches or updates that resolve known issues.
Debugging: If you have access to technical resources, consider debugging the program to identify the exact point of failure in the calculation.
Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP Support for further assistance.
Related Information
By following these steps, you should be able to identify and resolve the AO215 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
AO214
The start and end date of planning could not be found in profile
What causes this issue? The system could not determine the start and end dates for planning from planning profile &V1& for revenue planning.S...
AO213
The fiscal year variant for company code &1 was not found
What causes this issue? The fiscal year variant for company code &V1& was not found. Possibly it is not maintained.How to fix this error? Ch...
AO216
Error when calculating the internal rate of return
What causes this issue? An error occurred during calculation of the internal rate of return. Possible causes are: Evaluation type does not exist. Yie...
AO217
Error when calculating the payback period
What causes this issue? An error occurred during calculation of the payback period. Possible causes are: Evaluation type does not exist. Yield curve ...
Click on this link to search all SAP messages.