Message type: E = Error
Message class: AH - IS-U billing (master data)
Message number: 908
Message text: Simulation period not completely covered by price/operand &1
The simulation period is not completely covered by price or operand &v1&
.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AH908
- Simulation period not completely covered by price/operand &1 ?The SAP error message AH908, which states "Simulation period not completely covered by price/operand &1," typically occurs in the context of pricing or cost simulation in SAP, particularly in modules like SAP Controlling (CO) or SAP Product Costing. This error indicates that the simulation period you are trying to analyze does not have complete pricing or operand data for the entire duration of the simulation.
Cause: Missing Price Data: The price or operand data for the specified period is incomplete. This could happen if there are gaps in the pricing records or if the prices have not been maintained for the entire period. Incorrect Period Settings: The simulation period may be set incorrectly, leading to a mismatch with the available price data. Data Validity: The validity dates of the price records may not cover the entire simulation period.
Configuration Issues: There may be configuration issues in the pricing procedure or the way the simulation is
Get instant SAP help. Sign up for our Free Essentials Plan.
AH907
Enter a consecutive number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AH906
Use at least one selection
What causes this issue? You have set the indicator so that none of the selections can be used. This is not permissible. At least one selection is req...
AH909
Only the 'normal price' price type is permitted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AH910
Prices from different time categories are allocated to operand &1
What causes this issue? Prices with different time categories are allocated to operand &V1&.System Response The system issues an error messa...
Click on this link to search all SAP messages.