Do you have any question about this error?
Message type: E = Error
Message class: AH - IS-U billing (master data)
Message number: 631
Message text: Specify the length of the period-end billing period
You have defined a period-end billing. In doing so, you must specify
the number of periods over which the period-end billing is to be
carried out.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Specify the number of periods.
Error message extract from SAP system. Copyright SAP SE.
AH631
- Specify the length of the period-end billing period ?The SAP error message AH631, which states "Specify the length of the period-end billing period," typically occurs in the context of billing processes, particularly when dealing with period-end billing in SAP Convergent Charging or similar modules. This error indicates that the system requires a specification of the billing period's length, which is essential for processing billing correctly.
Cause:
- Missing Configuration: The billing period length may not be defined in the system settings or configuration for the billing type you are using.
- Incorrect Input: The user may not have provided the necessary details regarding the billing period length when attempting to execute a billing run.
- System Settings: There may be a misconfiguration in the billing settings or parameters that govern how billing periods are defined and processed.
Solution:
Check Configuration:
- Navigate to the relevant configuration settings in SAP (usually found in the SPRO transaction).
- Ensure that the billing period length is defined for the billing type you are working with. This may involve checking the settings under "Billing" or "Period-End Billing" sections.
Input Required Data:
- When executing the billing run, ensure that you provide all necessary parameters, including the length of the billing period. This may involve specifying start and end dates or the duration of the billing cycle.
Review Documentation:
- Consult the SAP documentation or help files related to billing processes to understand the required fields and configurations better.
Consult with SAP Support:
- If the issue persists after checking configurations and inputs, consider reaching out to SAP support or your internal SAP team for further assistance. They may provide insights specific to your system's configuration.
Related Information:
SPRO
for configuration, VF01
for billing document creation, and FBL1N
for vendor line items, if applicable.By following these steps, you should be able to resolve the AH631 error and successfully process your period-end billing.
Get instant SAP help. Start your 7-day free trial now.
AH630
Gas proc.&1: MUnit bef. conv.w. CV &2 uneq. to MUnit after conv.w. VCF &3
What causes this issue? If a conversion factor is used for a gas procedure, then the unit of measurement before conversion with the volume correction...
AH629
There are two primary meters for secondary meter device &1 register &2
What causes this issue? There are two primary meters for meter device &V1& register number &V2& with the logical register number &...
AH632
Tax code could not be determined
What causes this issue? A line item relevant to posting is to be generated. As part of this process, the system determines a tax code for sub-transac...
AH633
External price &1 price cat. &2 price level &3: incorrect history table
What causes this issue? During determination of the external price via the user exit EXIT_SAPLEA91_001 (for example: EBL prices), the history table E...
Click on this link to search all SAP messages.