How To Fix AD_MPN_RBA_MESS004 - Material available in required quantity


AD_MPN_RBA_MESS004 - Overview

  • Message type: E = Error

  • Message class: AD_MPN_RBA_MESS - Rules Based ATP und Config Control

  • Message number: 004

  • Message text: Material available in required quantity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AD_MPN_RBA_MESS004 - Material available in required quantity ?
    The SAP error message AD_MPN_RBA_MESS004 typically indicates that there is an issue related to the availability of a material in the required quantity for a specific process, such as a production order, sales order, or other inventory-related transactions. This message is often associated with the Material Requirements Planning (MRP) or Advanced Planning and Optimization (APO) modules in SAP.
    
    Cause: Insufficient Stock: The most common cause is that the system has determined that there is not enough stock of the material available to fulfill the demand. Incorrect MRP Settings: MRP settings may not be configured correctly, leading to inaccurate availability checks. Lead Time Issues: The lead time for procurement or production may not be sufficient to meet the required quantity. Batch Management: If batch management is enabled, there may be issues with batch availability. Reservation Issues: There may be existing reservations for the material that are consuming the available stock. Incorrect Planning Parameters: Planning parameters such as safety

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker