Do you have any question about this error?
Message type: E = Error
Message class: ACE_S4 - Messages for S/4HANA Accrual Engine
Message number: 052
Message text: The start date must be ahead of the end date for accrual item &3/&4.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
ACE_S4052
- The start date must be ahead of the end date for accrual item &3/&4. ?The SAP error message ACE_S4052 indicates that there is an issue with the date configuration for an accrual item. Specifically, it means that the start date for the accrual item is set to a date that is not earlier than the end date. This can occur in various SAP modules, particularly in financial accounting and controlling where accruals are managed.
Cause:
- Incorrect Date Entry: The start date has been entered incorrectly, either manually or through a data import.
- System Configuration: There may be a configuration issue in the system that is causing the dates to be interpreted incorrectly.
- Data Migration Issues: If data has been migrated from another system, the date formats or values may not have been converted correctly.
- User Error: Users may not be aware of the requirement that the start date must precede the end date.
Solution:
- Check Date Entries: Review the start and end dates for the accrual item in question. Ensure that the start date is indeed earlier than the end date.
- Correct the Dates: If the dates are incorrect, update them to ensure that the start date is before the end date.
- Validation Rules: Implement validation rules in the system to prevent users from entering dates incorrectly in the future.
- Consult Documentation: Refer to SAP documentation or help files for specific instructions on how to manage accrual items and their date settings.
- Testing: After making changes, test the accrual item to ensure that the error does not reoccur.
Related Information:
FBS1
(to post accruals) or FBL1N
(to view vendor line items) to manage accruals.By addressing the root cause of the error and ensuring proper date management practices, you can resolve the ACE_S4052 error effectively.
Get instant SAP help. Start your 7-day free trial now.
ACE_S4051
Enter the end life date for accrual item &1/&2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ACE_S4050
Enter the start life date for accrual item &1/&2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ACE_S4053
No representative ledger found for item type &1 in company code &2
What causes this issue? No representative ledger is determined from the assigned ledger groups to item type &V1& in company code &V2&...
ACE_S4054
Accrual Item contains errors
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.