Message type: E = Error
Message class: ACE - Nachrichten zur Accrual Engine
Message number: 501
Message text: The validity of the accrual object ends before the simulation key date
You want to simulate data in the Accrual Engine to date &V1&.
However, the accrual object that is to be executed for the simulation
is only valid until &V2& (table ACEDSOH, field VALITY_TO).
This affects the following accrual object:
Internal reference of the accrual object (GUID): &V3&
Internal reference of the accrual subobject (GUID): &V4&
The simulation will only be run up to &V2&.
Error message extract from SAP system. Copyright SAP SE.
ACE501
- The validity of the accrual object ends before the simulation key date ?The SAP error message ACE501 indicates that there is an issue with the validity of an accrual object in relation to a simulation key date. This error typically arises in the context of accrual accounting, where the system is trying to process an accrual but finds that the validity period of the accrual object has already expired before the specified key date for the simulation.
Cause: Expired Accrual Object: The accrual object (such as a contract, agreement, or other financial instrument) has a validity period that ends before the simulation key date you are trying to use. Incorrect Key Date: The simulation key date may have been set incorrectly, leading to a mismatch with the accrual object's validity. Data Entry Errors: There may be errors in the data entry for the accrual object, such as incorrect start or end dates.
Solution: Check Validity Dates: Review the validity dates of the accrual object in question. Ensure that
Get instant SAP help. Sign up for our Free Essentials Plan.
ACE500
Key date for simulation is before the last actual posting date
What causes this issue? You want to simulate data in the Accrual Engine for key date &V1&. However, actual data already exists up to date &am...
ACE460
Define the last closed fiscal year for company code &1
trados = docu -> fi -> figlWhat causes this issue? In the Customizing for the Accrual Engine, the last fiscal year closed has not been defined...
ACE502
The validity of the accrual object begins after the simulation key date
What causes this issue? You want to simulate data in the Accrual Engine up to date &V1&. However, the accrual object for which you want to ca...
ACE503
No actual posting data exists before simulation key date &1
What causes this issue? You want to simulate data in the Accrual Engine up to date &V1&. Up to this date, there are actual postings on this a...
Click on this link to search all SAP messages.