How To Fix /ACCGO/PRC_MC046 - *************************ASSIGNMENT DETAILS***************************


/ACCGO/PRC_MC046 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/PRC_MC -

  • Message number: 046

  • Message text: *************************ASSIGNMENT DETAILS***************************

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ACCGO/PRC_MC046 - *************************ASSIGNMENT DETAILS*************************** ?
    The SAP error message /ACCGO/PRC_MC046 typically relates to issues in the context of the SAP General Ledger or the Controlling module, particularly when dealing with assignment details in financial documents or postings. The error message may indicate that there is a problem with the assignment of cost elements, cost centers, or other related financial objects.
    
    Cause: Missing Assignment: The error may occur if there is a missing assignment for a cost element or cost center in the document being processed. Incorrect Configuration: There may be configuration issues in the controlling area or the financial settings that prevent proper assignment. Data Inconsistency: There could be inconsistencies in the master data related to cost centers, profit centers, or other financial objects. Authorization Issues: The user may not have the necessary authorizations to perform the assignment or access the required data.
    Solution: Check Assignments: Review the document or transaction that triggered the error to ensure that all necessary assignments (cost

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant