How To Fix /ACCGO/MCK_MAINT884 - Supply Date_from and Date_to to BOM explosion for Material &1 Plant &2


/ACCGO/MCK_MAINT884 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/MCK_MAINT -

  • Message number: 884

  • Message text: Supply Date_from and Date_to to BOM explosion for Material &1 Plant &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ACCGO/MCK_MAINT884 - Supply Date_from and Date_to to BOM explosion for Material &1 Plant &2 ?
    The SAP error message /ACCGO/MCK_MAINT884 typically indicates an issue related to the supply date range for a Bill of Materials (BOM) explosion in the context of material planning. This error can occur when the system is unable to find a valid supply date range for the specified material and plant combination.
    
    Cause: Invalid Date Range: The supply date range specified (Date_from and Date_to) may not be valid or may not cover the required planning horizon. Missing BOM: The BOM for the specified material and plant may not exist or may not be valid for the given date range. Material Status: The material may be in a status that prevents it from being used in production or planning (e.g., blocked, discontinued).
    Configuration Issues: There may be configuration issues in the system that prevent the BOM from being exploded correctly. Master Data Issues: There could be issues with the master data for the material, such as missing or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker