Do you have any question about this error?
Message type: E = Error
Message class: /ACCGO/MCK_MAINT -
Message number: 884
Message text: Supply Date_from and Date_to to BOM explosion for Material &1 Plant &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ACCGO/MCK_MAINT884
- Supply Date_from and Date_to to BOM explosion for Material &1 Plant &2 ?The SAP error message
/ACCGO/MCK_MAINT884
typically indicates an issue related to the supply date range for a Bill of Materials (BOM) explosion in the context of material planning. This error can occur when the system is unable to find a valid supply date range for the specified material and plant combination.Cause:
- Invalid Date Range: The supply date range specified (Date_from and Date_to) may not be valid or may not cover the required planning horizon.
- Missing BOM: The BOM for the specified material and plant may not exist or may not be valid for the given date range.
- Material Status: The material may be in a status that prevents it from being used in production or planning (e.g., blocked, discontinued).
- Configuration Issues: There may be configuration issues in the system that prevent the BOM from being exploded correctly.
- Master Data Issues: There could be issues with the master data for the material, such as missing or incorrect data in the material master or BOM.
Solution:
- Check Date Range: Verify that the supply date range (Date_from and Date_to) is correctly set and falls within the valid planning horizon.
- Validate BOM: Ensure that a valid BOM exists for the specified material and plant. You can check this in the BOM transaction (CS03) to see if the BOM is active and valid for the required dates.
- Review Material Status: Check the status of the material in the material master (MM03) to ensure it is not blocked or restricted for use.
- Check Configuration: Review the configuration settings related to BOM and material planning to ensure they are set up correctly.
- Master Data Review: Ensure that all relevant master data (material master, BOM, routing) is complete and accurate.
- Consult Documentation: Refer to SAP documentation or notes related to this specific error message for any additional troubleshooting steps or known issues.
Related Information:
By following these steps, you should be able to identify and resolve the issue causing the error message /ACCGO/MCK_MAINT884
.
Get instant SAP help. Start your 7-day free trial now.
/ACCGO/MCK_MAINT883
ALV Error.. Cannot proceed further
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/MCK_MAINT882
Importing parameter BOM type is missing for BOM explosion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/MCK_MAINT885
Supply Date_from to BOM explosion for Material &1 Plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/MCK_MAINT886
Supply Date_To to BOM explosion for Material &1 Plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.