Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix /ACCGO/MCK_MAINT430 - Active BOM found on explosion date &1


/ACCGO/MCK_MAINT430 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/MCK_MAINT -

  • Message number: 430

  • Message text: Active BOM found on explosion date &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/ACCGO/MCK_MAINT430 - Details

  • The SAP error message /ACCGO/MCK_MAINT430 Active BOM found on explosion date &1 typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module or when dealing with Bill of Materials (BOM) in the SAP system. This error indicates that there is an active BOM (Bill of Materials) that is valid on the specified explosion date, which may be causing issues with the processing of the material or the planning run.
    
    Cause: Active BOM Exists: The error suggests that there is an active BOM for the material that is valid on the specified explosion date. This can happen if the system is trying to process a material that has a BOM that is currently active and valid. Date Mismatch: The explosion date may not align with the validity period of the BOM, leading to conflicts in the planning process.
    Configuration Issues: There may be configuration issues in the BOM settings or in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/ACCGO/MCK_MAINT430 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker