How To Fix /ACCGO/MCK_MAINT267 - Plant assigned to ingredient &1 of BOM ID &2


/ACCGO/MCK_MAINT267 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/MCK_MAINT -

  • Message number: 267

  • Message text: Plant assigned to ingredient &1 of BOM ID &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ACCGO/MCK_MAINT267 - Plant assigned to ingredient &1 of BOM ID &2 ?
    The SAP error message /ACCGO/MCK_MAINT267 Plant assigned to ingredient &1 of BOM ID &2 typically occurs in the context of managing Bill of Materials (BOM) in SAP, particularly when dealing with the Material Costing (MCK) functionality. This error indicates that there is an issue with the assignment of a plant to a specific ingredient in the BOM.
    
    Cause: Missing Plant Assignment: The ingredient (material) specified in the error message does not have a valid plant assignment in the BOM. Incorrect Configuration: The BOM may not be properly configured for the specified plant, leading to inconsistencies. Data Inconsistencies: There may be inconsistencies in the master data for the materials involved, such as missing or incorrect plant-specific data.
    Solution: Check BOM Configuration: Go to the BOM transaction (e.g., CS02) and check the BOM for the specified ID (&2). Ensure that the ingredient (&1) is correctly assigned to the appropriate plant. Assign Plant to Ingredient: If the plant assignment is missing, you can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant