Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix /ACCGO/MCK_MAINT252 - BOM is assigned to plant &1 and counterparty &2


/ACCGO/MCK_MAINT252 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/MCK_MAINT -

  • Message number: 252

  • Message text: BOM is assigned to plant &1 and counterparty &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/ACCGO/MCK_MAINT252 - Details

  • The SAP error message /ACCGO/MCK_MAINT252 indicates that there is an issue related to a Bill of Materials (BOM) assignment in the context of a specific plant and counterparty. This error typically arises in the context of the SAP S/4HANA system, particularly in the area of accounting and controlling.
    
    Cause: The error message suggests that the BOM you are trying to maintain or modify is already assigned to a specific plant and counterparty. This can occur due to several reasons: Existing Assignment: The BOM is already linked to the specified plant and counterparty, and you may be trying to create a duplicate entry. Data Integrity Issues: There may be inconsistencies in the data that prevent the system from allowing changes to the BOM. Authorization Issues: The user may not have the necessary permissions to modify the BOM for the specified plant and counterparty.
    Solution: To resolve this error, you can take the following steps: Check Existing BOM Assignments: Use transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/ACCGO/MCK_MAINT252 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker