Do you have any question about this error?
Message type: E = Error
Message class: /ACCGO/MCK_MAINT -
Message number: 113
Message text: Assign plant/partner to the selected PBOM
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ACCGO/MCK_MAINT113
- Assign plant/partner to the selected PBOM ?The SAP error message
/ACCGO/MCK_MAINT113 Assign plant/partner to the selected PBOM
typically occurs in the context of managing Product Bills of Material (PBOM) in the SAP system, particularly when dealing with the configuration of materials and their associated plants or partners.Cause:
This error usually arises when there is an attempt to create or modify a PBOM without properly assigning a plant or partner to it. The system requires that each PBOM is linked to a specific plant or partner to ensure that the materials are correctly managed and accounted for in the respective locations.
Solution:
To resolve this error, you should follow these steps:
Access the PBOM Maintenance Transaction:
- Go to the transaction code related to PBOM maintenance (e.g.,
/ACCGO/MCK_MAINT
).Select the PBOM:
- Enter the relevant details to select the PBOM that is causing the error.
Assign Plant/Partner:
- Look for the section where you can assign a plant or partner to the PBOM. This may involve selecting a plant from a dropdown list or entering the plant code manually.
- Ensure that the plant or partner you are assigning is valid and exists in the system.
Save Changes:
- After assigning the plant or partner, save your changes to the PBOM.
Check for Additional Errors:
- If the error persists, check for any additional messages or requirements that may need to be addressed.
Related Information:
Transaction Codes:
/ACCGO/MCK_MAINT
for PBOM maintenance.Master Data:
Authorization:
Documentation:
Support:
By following these steps, you should be able to resolve the error and successfully assign a plant or partner to the selected PBOM.
Get instant SAP help. Start your 7-day free trial now.
/ACCGO/MCK_MAINT112
Assign plants to the selected CBOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/MCK_MAINT111
No BOMs found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/MCK_MAINT114
All plants have been assigned to the selected CBOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/MCK_MAINT115
Selected a BOM for the operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.