How To Fix /ACCGO/CCK_DPQS385 - DPQS override not allowed when schdl at unload loc is checked


/ACCGO/CCK_DPQS385 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/CCK_DPQS -

  • Message number: 385

  • Message text: DPQS override not allowed when schdl at unload loc is checked

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ACCGO/CCK_DPQS385 - DPQS override not allowed when schdl at unload loc is checked ?
    The SAP error message /ACCGO/CCK_DPQS385 DPQS override not allowed when schdl at unload loc is checked typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with the deployment of products in a supply chain scenario.
    
    Cause: This error message indicates that there is an attempt to override a deployment quantity in a situation where the scheduling at the unloading location is enabled. When the "schedule at unload location" option is checked, the system expects that the deployment quantities are strictly managed according to the defined scheduling rules, and overriding them is not permitted.
    Solution: To resolve this error, you can consider the following steps: Check Configuration: Review the configuration settings for the deployment process. Ensure that the "schedule at unload location" option is set according to your business requirements. If you do not need this feature, you may consider unchecking it. Review Deployment Quantities: Ensure that the deployment

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author