Message type: E = Error
Message class: /ACCGO/CCK_DPQS -
Message number: 241
Message text: Material used in value schedule is different from that in volume schedule
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/ACCGO/CCK_DPQS241
- Material used in value schedule is different from that in volume schedule ?The SAP error message /ACCGO/CCK_DPQS241 indicates that there is a discrepancy between the material used in the value schedule and the material used in the volume schedule. This error typically arises in the context of project management or cost accounting, particularly when dealing with project-related costs and budgets.
Cause: Mismatch of Materials: The most common cause of this error is that the material specified in the value schedule (which may represent the financial aspect of the project) does not match the material specified in the volume schedule (which may represent the physical quantities or resources used). Data Entry Errors: There may have been a mistake during data entry where the wrong material was assigned to either the value or volume schedule. Changes in Project Scope: If there have been changes in the project scope or materials used after the initial setup, this could lead to inconsistencies.
Configuration Issues: There may be configuration issues in the
Get instant SAP help. Sign up for our Free Essentials Plan.
/ACCGO/CCK_DPQS240
Enter a valid from date; it should be in future
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/CCK_DPQS239
Cannot change retired schedule &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/CCK_DPQS242
Enter calculation rule
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/ACCGO/CCK_DPQS243
Enter derived rule
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.