How To Fix /ACCGO/CAK_PFM029 - Contract create date &1 is not between sign start/end dates &2 and &3.


/ACCGO/CAK_PFM029 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/CAK_PFM -

  • Message number: 029

  • Message text: Contract create date &1 is not between sign start/end dates &2 and &3.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ACCGO/CAK_PFM029 - Contract create date &1 is not between sign start/end dates &2 and &3. ?
    The SAP error message /ACCGO/CAK_PFM029 Contract create date &1 is not between sign start/end dates &2 and &3 typically occurs in the context of contract management within the SAP system, particularly when dealing with contract creation and validity periods.
    
    Cause: This error indicates that the date you are trying to use for creating a contract does not fall within the defined start and end dates for the contract's signing period. Specifically: Contract Create Date (&1): This is the date you are attempting to set for the contract creation. Sign Start Date (&2): This is the beginning of the period during which the contract can be signed. Sign End Date (&3): This is the end of the period during which the contract can be signed. If the contract creation date is outside the range defined by the sign start and end dates, the system will throw this error.
    Solution: To resolve this error, you can take the following steps: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker