Message type: E = Error
Message class: AB -
Message number: 026
Message text: Processing terminated
A serious error occurred during the update run of primary cost planning
of depreciation/interest.
Processing is terminated.
Plan data is either not updated or not updated completely.
Check the error that occurred, correct the error and restart the update
run.
Error message extract from SAP system. Copyright SAP SE.
AB026
- Processing terminated ?The SAP error message AB026 ("Processing terminated") typically indicates that a program or transaction has encountered a critical error that prevents it from continuing. This error can occur in various contexts, such as during the execution of a report, a background job, or a transaction. Causes: Runtime Errors: The program may have encountered a runtime error due to issues like division by zero, accessing a null pointer, or other exceptions. Data Issues: Invalid or inconsistent data in the database can lead to processing errors. Configuration Problems: Incorrect configuration settings in the system can cause certain processes to fail. Authorization Issues: Lack of necessary authorizations for the user executing the transaction can lead to termination. System Resource Limitations: Insufficient memory or other system resources can cause processes to fail. Solutions: Check the Short Dump: Use transaction code ST22 to analyze the short dump associated with the error. This will provide detailed information about what caused the termination. Review Logs: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
AB025
Processing terminated
What causes this issue? A serious error occurred during the test run for primary cost planning of depreciation/interest.System Response Processing i...
AB024
Activity type dependent planning is only possible on cost centers
What causes this issue? You chose activity type dependent planning and at the same time set the indicator for planning on internal orders or WBS elem...
AB027
No authorization for company code &
What causes this issue? You are not authorized to carry out primary cost planning for depreciation/interest in company code &V1&.System Respo...
AB028
Missing posting rules
What causes this issue? You need special posting rules for primary cost planning for depreciation/interest, since it involves simulating the values o...