Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: AB -
Message number: 017
Message text: Specify whether planning is activity-type-dependent or independent
You have to specify whether planning should be activity type dependent
and/or activity type independent.
Select at least one of the parameters "activity type indep. planning"
or "activity type depend. planning".
Error message extract from SAP system. Copyright SAP SE.
AB017
- Specify whether planning is activity-type-dependent or independent ?The SAP error message AB017 indicates that there is a requirement to specify whether the planning is activity-type-dependent or independent in the context of activity-based costing or planning in SAP. This error typically arises in the context of controlling (CO) or project systems (PS) when you are trying to perform planning activities without having defined the necessary parameters.
Cause:
- Missing Configuration: The system requires a specification of whether the planning is based on activity types (activity-type-dependent) or not (activity-type-independent). If this specification is not set, the system cannot proceed with the planning process.
- Incorrect Settings: The settings in the controlling area or the specific cost center or internal order may not be configured correctly to allow for the desired type of planning.
- Transaction Context: The error may occur in specific transactions where planning is being executed, and the system needs clarity on how to handle the planning data.
Solution:
Check Configuration:
- Go to the configuration settings in SAP (Transaction SPRO).
- Navigate to Controlling -> Cost Center Accounting -> Planning -> Define Planning Layouts.
- Ensure that the planning layout is set up correctly to specify whether it is activity-type-dependent or independent.
Define Planning Type:
- In the planning layout, ensure that you have defined the planning type correctly. You may need to create or modify a planning layout to include the necessary specifications.
Cost Center/Order Settings:
- Check the settings for the specific cost center or internal order you are working with. Ensure that the planning parameters are correctly defined in the master data.
Use the Correct Transaction:
- Make sure you are using the correct transaction for the type of planning you want to perform. For example, if you are trying to perform activity-based planning, ensure that you are in the right transaction that supports this.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed steps on how to configure planning settings based on your specific version of SAP.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP CO or PS modules for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
AB016
Planning parameter & invalid for activity type dependent planning
What causes this issue? You chose activity-type-dependent planning. However, the selected planning parameter Does not exist, or Does not allow for ma...
AB015
Planning parameter & invalid for activity-type-independent planning
What causes this issue? You chose activity-type-independent planning. However, the selected planning parameter Does not exist, or Does not allow for ...
AB018
Processing terminated - Error in depreciation calculation
What causes this issue? During the calculation of planned primary costs, an exception arose in function module RA_AFABUCHEN. Processing was terminate...
AB019
Planning parameter & plans only fixed costs
What causes this issue? Planning parameter &V1& that was entered plans only for fixed costs. The calculated overhead costs are ignored.System...
Click on this link to search all SAP messages.