Message type: E = Error
Message class:  9J1UF_MAJOR_REPAIR - Assets repairs. Message class 
Message number: 005
Message text: APC is being increased for a different fiscal year
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message 9J1UF_MAJOR_REPAIR005 indicates that there is an issue related to the Asset Accounting (FI-AA) module, specifically concerning the Asset Under Construction (AUC) and the allocation of costs to different fiscal years. This error typically arises when there is an attempt to increase the Acquisition and Production Cost (APC) of an asset for a fiscal year that is different from the one in which the asset was originally created or in which the costs were incurred.
Cause: Fiscal Year Mismatch: The primary cause of this error is that the system is trying to post an increase in the APC for an asset in a fiscal year that does not match the fiscal year of the original asset creation or the fiscal year of the costs being allocated. Incorrect Configuration: There may be configuration issues in the Asset Accounting settings that do not allow for the proper posting of costs across fiscal
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
9J1UF_MAJOR_REPAIR004 Cost increase for repairs from different fiscal year is not permitted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J1UF_MAJOR_REPAIR003 Incorrect quarter &1; enter a number between 1 and 4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J1UF_MAJOR_REPAIR006 Perform APC increase on last day of fiscal year
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J1UF_MAJOR_REPAIR007 Incorrect asset number &1 &2 in table of asset repairs (tr. J1UFCUPREP)
What causes this issue?  The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.