Do you have any question about this error?
Message type: E = Error
Message class: 9J -
Message number: 341
Message text: Project points to plant &1 (not plant &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
9J341
- Project points to plant &1 (not plant &2) ?The SAP error message 9J341 indicates that there is a mismatch between the plant assigned to a project and the plant that is being referenced in a transaction. Specifically, the message states that the project points to one plant (denoted as &1) while the transaction is trying to reference a different plant (denoted as &2). This typically occurs in the context of project management and controlling within SAP, particularly when dealing with project-related transactions.
Cause:
- Plant Assignment Mismatch: The project is assigned to a specific plant, but the transaction is attempting to use a different plant.
- Configuration Issues: There may be configuration settings in the project system that are not aligned with the plants being used in transactions.
- Data Entry Errors: Users may have inadvertently selected the wrong plant during data entry.
Solution:
- Verify Project Assignment: Check the project definition to confirm which plant is assigned to the project. You can do this by navigating to the project in the Project System (PS) module and reviewing its details.
- Check Transaction Plant: Ensure that the plant being referenced in the transaction matches the plant assigned to the project. If necessary, change the plant in the transaction to match the project’s assigned plant.
- Adjust Configuration: If the project needs to be associated with a different plant, you may need to adjust the project settings or reassign the project to the correct plant.
- User Training: Ensure that users are trained to select the correct plant when entering transactions related to projects.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module.
Get instant SAP help. Start your 7-day free trial now.
9J340
WBS element &1 points to plant &2 (not plant &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J339
No entry found for key &2 in table &1. &3 &4
What causes this issue? In table &V1&, no entry for key &V2& was found. The system issues an error message and will not allow you to ...
9J342
Increment item no. is missing for sales document type &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J343
Error during CO object determination. SD document & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.