Message type: E = Error
Message class: 7A - PS Progress Analysis
Message number: 051
Message text: Degree of processing can only be used for actual percentage of completion
You have selected measurement method &V1& for field &V2&. In this
method, the system copies the degree of processing in the confirmation
as the degree of completion. You can only use the degree of processing
for the actual degree of completion. However the field &V2& is not
valid for actual degree of completion.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Check your entries, and correct them, if necessary.
Error message extract from SAP system. Copyright SAP SE.
7A051
- Degree of processing can only be used for actual percentage of completion ?The SAP error message 7A051 ("Degree of processing can only be used for actual percentage of completion") typically occurs in the context of project management or production order processing within SAP. This error indicates that there is an issue with the way the degree of processing is being handled in relation to the actual percentage of completion for a project or order.
Cause:
- Incorrect Configuration: The system may be configured to expect a certain type of processing status, but the data being entered does not meet those expectations.
- Data Entry Issues: Users may be trying to enter a degree of processing that is not valid for the current status of the project or order.
- Inconsistent Status: The project or order may have a status that does not allow for the degree of processing to be updated or changed.
- Missing Actual Data: The actual percentage of completion may not have been recorded or updated, leading to discrepancies.
Solution:
- Check Configuration: Review the configuration settings for the project or order type in SAP. Ensure that the settings allow for the degree of processing to be updated based on the actual percentage of completion.
- Verify Data Entry: Ensure that the data being entered is correct and that the degree of processing aligns with the actual percentage of completion. Make sure that the actual completion data is recorded before attempting to update the degree of processing.
- Update Status: If the project or order is in a status that does not allow for updates, consider changing the status to one that does permit updates.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling degrees of processing and actual percentages of completion.
- Check for Missing Data: Ensure that all necessary data has been entered and that there are no missing entries that could be causing the error.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
7A050
No measurement method & defined
What causes this issue? Measurement method &V1& does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXH...
7A024
& not allowed for activity elements
What causes this issue? Measurement methods based on the milestone technique cannot be used for activity elements. This technique can only be applied...
7A052
& can only be used for actual percentage of completion
What causes this issue? You have selected measurement method &V1&. In this method, the system copies the degree of processing in the confirma...
7A053
Actual = Plan can only be used for actual percentage of completion
What causes this issue? You have selected measurement method &V1&. In this method, the system copies the planned POC to the actual POC. You c...
Click on this link to search all SAP messages.