Message type: E = Error
Message class: 7A - PS Progress Analysis
Message number: 023
Message text: Reference object is only appropriate for secondary proportionality
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
7A023
- Reference object is only appropriate for secondary proportionality ?The SAP error message 7A023 ("Reference object is only appropriate for secondary proportionality") typically occurs in the context of SAP Controlling (CO) when dealing with cost allocation or distribution processes. This error indicates that the reference object you are trying to use is not suitable for the type of proportionality you are attempting to apply.
Cause:
The error arises when:
To resolve this error, consider the following steps:
Check the Reference Object: Ensure that the reference object you are using is indeed a secondary cost element or a secondary cost object. If it is a primary cost element, you will need to change it to a secondary one.
Review Configuration: Verify the configuration settings in the controlling area. Ensure that the settings for cost allocation and distribution are correctly defined to allow for the intended proportionality.
Adjust the Allocation Method: If you are using a specific allocation method, check if it is set up correctly. You may need to adjust the method to ensure it aligns with the type of cost elements you are working with.
Consult Documentation: Refer to SAP documentation or help resources for detailed information on the specific allocation methods and their requirements.
Testing: After making changes, perform a test run to ensure that the error does not occur again.
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling for further assistance.
Get instant SAP help. Start your 7-day free trial now.
7A022
Correct the reference object
What causes this issue? The object you have selected, you have also choosen as a reference object. This is not allowed. Only one object in the curren...
7A021
Enter a unique reference object
What causes this issue? You have not selected a unique reference object.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX...
7A024
& not allowed for activity elements
What causes this issue? Measurement methods based on the milestone technique cannot be used for activity elements. This technique can only be applied...
7A050
No measurement method & defined
What causes this issue? Measurement method &V1& does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXH...