Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix 6P527 - No long-term dependent requirements exist for material & &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 527

  • Message text: No long-term dependent requirements exist for material & &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P527 - No long-term dependent requirements exist for material & & ?

    The SAP error message 6P527 ("No long-term dependent requirements exist for material & &") typically occurs in the context of production planning and material requirements planning (MRP) when the system is unable to find any long-term dependent requirements for a specified material. This can happen in various scenarios, such as when trying to create a production order, run MRP, or analyze material requirements.

    Causes:

    1. No Dependent Requirements: The most straightforward cause is that there are no dependent requirements (like planned orders, production orders, or sales orders) for the specified material in the system.
    2. Incorrect Material Master Data: The material may not be set up correctly in the material master, leading to issues in requirement generation.
    3. MRP Settings: The MRP settings for the material may not be configured properly, which can prevent the generation of dependent requirements.
    4. Planning Version: The planning version being used may not have any active requirements for the material.
    5. Date Issues: The date range for which you are trying to view requirements may not include any relevant data.

    Solutions:

    1. Check Material Master: Verify the material master data for the material in question. Ensure that it is set up correctly, including MRP type, lot size, and other relevant fields.
    2. Review MRP Settings: Check the MRP settings for the material. Ensure that the MRP type is appropriate and that the material is included in the planning run.
    3. Run MRP: If you haven't already, run the MRP process for the relevant planning area. This may generate the necessary dependent requirements.
    4. Check Planning Version: Ensure that you are using the correct planning version that contains the relevant data for the material.
    5. Analyze Requirements: Use transaction codes like MD04 (Stock/Requirements List) to analyze the requirements for the material and see if there are any existing dependent requirements.
    6. Check Date Range: Ensure that you are looking at the correct date range for the requirements. Adjust the date filters if necessary.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04 (Stock/Requirements List), MD01 (MRP Run), and MD02 (Single-item, Multi-level MRP).
    • MRP Types: Understand the different MRP types (e.g., PD, VB, etc.) and how they affect the generation of dependent requirements.
    • Material Status: Check if the material is blocked or has a status that prevents it from being included in MRP runs.
    • Documentation: Refer to SAP documentation or help files for more detailed information on MRP processes and error messages.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and MRP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant