How To Fix 6P505 - The production plan has changed for the PG


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 505

  • Message text: The production plan has changed for the PG

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P505 - The production plan has changed for the PG ?

    The SAP error message 6P505, "The production plan has changed for the PG," typically indicates that there has been a modification in the production plan for a particular production group (PG) that affects the current operation or transaction you are trying to perform. This error can arise in various contexts, such as during production order processing, planning, or execution.

    Causes:

    1. Changes in Production Plan: The production plan for the production group has been altered after the initial planning was done. This could be due to changes in demand, resource availability, or other planning parameters.
    2. Data Consistency Issues: There may be inconsistencies in the data between the production order and the planning data.
    3. User Actions: A user may have manually changed the production plan or related parameters, leading to this error.
    4. System Updates: Changes made by system updates or batch jobs that modify production plans can also trigger this error.

    Solutions:

    1. Review Production Plan: Check the production plan for the affected production group to understand what changes have been made. You can do this through transaction codes like MD04 (Stock/Requirements List) or MD02 (MD Planning).
    2. Reprocess the Transaction: If the production plan has changed, you may need to reprocess the transaction you were attempting. This could involve re-confirming production orders or re-running planning runs.
    3. Check for Lock Entries: Ensure that there are no lock entries on the production order or related objects that might be causing the issue.
    4. Consult Change Logs: Look at the change logs to identify what changes were made to the production plan and by whom. This can help in understanding the context of the error.
    5. Coordinate with Planning Team: If the changes were made by the planning team, coordinate with them to understand the implications of the changes and how to proceed.
    6. System Configuration: If this error occurs frequently, it may be worth reviewing the system configuration and settings related to production planning to ensure they align with business processes.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04, CO02 (Change Production Order), and COHV (Mass Processing of Production Orders) for managing production orders and plans.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP Support may have specific recommendations or fixes.
    • Documentation: Review SAP documentation on production planning and order management for best practices and troubleshooting steps.

    If the issue persists after trying the above solutions, it may be necessary to involve your SAP support team or consult with SAP directly for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant