How To Fix 6P502 - Planned independent requirements not included in MRP


6P502 - Overview

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 502

  • Message text: Planned independent requirements not included in MRP

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P502 - Planned independent requirements not included in MRP ?
    The SAP error message 6P502 indicates that planned independent requirements (PIRs) are not included in the Material Requirements Planning (MRP) run. This can occur for several reasons, and understanding the cause is essential for resolving the issue.
    Causes:
    
    MRP Settings: The MRP settings for the material may not be configured to consider planned independent requirements. This can happen if the MRP type is set incorrectly.
    Planning Version: The planning version used in the MRP run may not include the planned independent requirements.
    PIR Validity: The planned independent requirements may not be valid for the period in which the MRP run is executed. This can occur if the PIRs are outside the planning horizon.
    MRP Group Settings: The MRP group assigned to the material may not be set up to include PIRs.
    Material Status: The material may have a status that prevents it from being planned (e.g., "Blocked" or "Not relevant for MRP").
    PIR Deletion: The planned independent

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author