How To Fix 6P499 - Planning is not allowed with the matetial type &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 499

  • Message text: Planning is not allowed with the matetial type &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P499 - Planning is not allowed with the matetial type & ?

    The SAP error message 6P499 ("Planning is not allowed with the material type &") typically occurs when you attempt to perform planning activities (like MRP or forecasting) on a material that is assigned a material type that does not support planning. This can happen in various scenarios, such as when the material type is set up for non-planning purposes or is restricted from being included in planning processes.

    Cause:

    1. Material Type Configuration: The material type assigned to the material is configured in such a way that it does not allow planning. Common examples include material types like "Non-stock material" or "Service" materials.
    2. Material Master Settings: The material master record may have settings that prevent it from being included in planning runs.
    3. MRP Type: The MRP type assigned to the material may be set to a type that does not allow planning (e.g., "ND" for non-planned).
    4. Plant Settings: The plant settings for the material type may restrict planning activities.

    Solution:

    1. Check Material Type: Verify the material type assigned to the material. If it is a type that does not support planning, consider changing the material type to one that does (e.g., from "Non-stock material" to "Raw material").
    2. Review Material Master Data: Go to the material master record and check the MRP views. Ensure that the MRP type is set correctly and that the planning parameters are appropriate for your needs.
    3. Adjust MRP Type: If the MRP type is set to a non-planning type, change it to a planning type (e.g., "PD" for MRP).
    4. Consult Configuration: If you have access to the configuration settings, check the material type configuration in SPRO (Customizing) to see if planning is enabled for that material type.
    5. Consult with SAP Basis or Functional Consultant: If you are unsure about making changes, consult with your SAP Basis or functional consultant to ensure that any changes made align with your organization's processes.

    Related Information:

    • Transaction Codes: You can use transaction codes like MM02 to change the material master data and MM03 to view it.
    • MRP Configuration: Review the MRP configuration in SPRO under "Production" -> "Material Requirements Planning" to understand how material types and MRP types are set up.
    • Documentation: Refer to SAP Help documentation for detailed information on material types and their planning capabilities.

    By following these steps, you should be able to resolve the error and enable planning for the material in question.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker