Do you have any question about this error?
Message type: E = Error
Message class: 6P - Messages for planned independent requirements (Appl.area 60)
Message number: 496
Message text: Date in the planning time fence (& - &) deleted
In Customizing for Demand Management, you specified that the system is
to issue a warning if changes are made within the planning time fence.
The planning time fence represents a period during which the
<GL:demand_program>demand program</> is protected from any changes.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Schedule lines were deleted in the planning time fence.
Error message extract from SAP system. Copyright SAP SE.
6P496
- Date in the planning time fence (& - &) deleted ?The SAP error message 6P496, which states "Date in the planning time fence (& - &) deleted," typically occurs in the context of production planning and scheduling within SAP's Advanced Planning and Optimization (APO) or similar modules. This error indicates that a date that was previously within the planning time fence has been deleted or is no longer valid.
Cause:
- Changes in Planning Parameters: The planning time fence may have been altered, leading to the deletion of dates that were previously considered valid.
- Master Data Changes: Changes in the master data (like material master, production versions, or resource availability) can affect the planning time fence.
- Planning Run Issues: If a planning run is executed and the settings or parameters are not aligned with the current data, it can lead to inconsistencies.
- Manual Adjustments: Manual changes made to the planning data or scheduling can inadvertently lead to the deletion of dates.
Solution:
- Review Planning Time Fence Settings: Check the planning time fence settings in the relevant configuration (transaction codes like OPPQ for planning parameters) to ensure they are set correctly.
- Check Master Data: Verify the master data for the materials or resources involved to ensure that there are no inconsistencies or missing information.
- Re-run Planning: If the issue arose after a planning run, consider re-running the planning process after verifying all settings and data.
- Analyze Change Logs: Look into change logs to identify what changes were made that could have led to the deletion of the date.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
- Engage with SAP Support: If the issue persists, consider reaching out to SAP support for further assistance, especially if it is impacting business operations.
Related Information:
By following these steps, you should be able to diagnose and resolve the issue related to the SAP error message 6P496.
Get instant SAP help. Start your 7-day free trial now.
6P495
You cannot make any deletions in the planning time fence (& - &)
What causes this issue? In Customizing, you determined that no new schedule lines can be created in the planning time fence, nor can existing schedul...
6P494
Material is blocked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P497
Material & has no valuation price
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P498
Consumption indicator & is not possible with this requirements class
What causes this issue? The consumption indicator used here with this requirements type does not correspond to the default value that was maitained i...
Click on this link to search all SAP messages.