Do you have any question about this error?
Message type: E = Error
Message class: 6E - Messages for EMU currency conversion in Treasury
Message number: 131
Message text: Drawing not reset because it was changed
INCLUDE TRLO_EMU_DRAW_KEY OBJECT DOKU ID TX
The drawing cannot be reset, since it has been changed after the
contract currency changeover to euro. The reset procedure would also
reset these changes.
Processing is terminated.
Error message extract from SAP system. Copyright SAP SE.
6E131
- Drawing not reset because it was changed ?The SAP error message 6E131 ("Drawing not reset because it was changed") typically occurs in the context of SAP Engineering Change Management (ECM) or when dealing with document management in SAP. This error indicates that a drawing or document has been modified, and as a result, the system is unable to reset it to a previous state.
Cause:
- Modification of the Drawing: The drawing or document has been altered after it was initially created or released. This could include changes to the document itself or its metadata.
- Version Control: The system may be enforcing version control, preventing the reset of a drawing that has been changed.
- Locking Mechanism: The drawing may be locked by another user or process, preventing modifications or resets.
Solution:
- Check for Changes: Review the drawing or document to understand what changes have been made. If the changes are not needed, consider reverting them if possible.
- Version Management: If the drawing is part of a version-controlled environment, ensure that you are working with the correct version. You may need to create a new version or release the current version before attempting to reset.
- Unlock the Document: If the document is locked, check if another user has it open or if there are any processes that are currently using it. You may need to wait for the lock to be released or contact the user who has it locked.
- Consult Documentation: Refer to SAP documentation or your organization's guidelines on handling drawings and documents in the ECM module.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CC01
(Create Change Request) or CC02
(Change Change Request).By following these steps, you should be able to address the error message and understand the underlying issues related to the drawing or document in question.
Get instant SAP help. Start your 7-day free trial now.
6E130
Planned record not reset because it was changed
What causes this issue? INCLUDE TRLO_EMU_BEPP_KEY OBJECT DOKU ID TX The planned flow cannot be reset, since it has been changed after the contract cu...
6E129
Document item not reset because it was changed
What causes this issue? INCLUDE TRLO_EMU_BEPI_KEY OBJECT DOKU ID TX The document item cannot be reset, since it was changed after the contract curren...
6E132
Order not reset because it was changed
What causes this issue? INCLUDE TRLO_EMU_ORDER_KEY OBJECT DOKU ID TX The order cannot be reset, since it has been changed after the contract currency...
6E133
Loan not reset because it was changed
What causes this issue? INCLUDE TRLO_EMU_LOAN_KEY OBJECT DOKU ID TX Last changed by: &v3& Change date : &v4& The loan cannot be re...
Click on this link to search all SAP messages.