How To Fix 67141 - Prio.level 99 requires flow type with cancel.IP-ID 03 or 04


67141 - Overview

  • Message type: E = Error

  • Message class: 67 - Loans Messages - Financial Assets Management

  • Message number: 141

  • Message text: Prio.level 99 requires flow type with cancel.IP-ID 03 or 04

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 67141 - Prio.level 99 requires flow type with cancel.IP-ID 03 or 04 ?
    The SAP error message 67141 with the description "Prio.level 99 requires flow type with cancel. IP-ID 03 or 04" typically occurs in the context of SAP's Integrated Planning (IP) or Business Planning and Consolidation (BPC) modules. This error indicates that there is a configuration issue related to the flow types and priority levels in your planning environment.
    
    Cause: Flow Type Configuration: The error suggests that the priority level 99 is being used, which requires a specific flow type that supports cancellation. In this case, the flow types with IP-ID 03 (which usually represents "actuals") or 04 (which usually represents "plan") are expected. Incorrect Priority Level: The priority level set for the planning process may not be compatible with the flow types defined in the system. Missing or Incorrect Flow Type: The flow type that is being referenced may not be correctly set up in the system or may not exist.
    Solution: Check Flow Type Configuration: Go to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author